久久99国产精品尤物,欧美性受XXXX,国产偷国产偷亚洲清高APP,精品无码人妻一区二区三区品,日韩精品成人一区二区三区

歡迎來(lái)到重慶和泰液壓升降機械廠(chǎng) ,期待與您的合作!

關(guān)于我們|聯(lián)系我們|收藏本站

重慶和泰液壓升降機械廠(chǎng)

重慶和泰液壓升降機械廠(chǎng) 一站式液壓升降平臺生產(chǎn)服務(wù)商

全國服務(wù)熱線(xiàn)189-0831-8192

重慶和泰液壓升降機械廠(chǎng)

重慶升降平臺機床如何進(jìn)行安裝?

來(lái)源:重慶和泰液壓升降機械廠(chǎng) 發(fā)布日期:2023-01-05 14:30:47

1、用一根圓鋼棍穿過(guò)機床的基座,并用一根粗麻繩,在圓鋼棍兩端各繞幾圈,掛在起重機的吊鉤上,為了避免損傷機件,必須墊放兩塊木塊。在吊起之前,應卸下手輪、墊圈和螺母。
Hangzhou with a round stick through the freight elevator machine base, and with a thick rope, in round stick around a few times at each end, hanging on the crane hook, in order to avoid damage to Hangzhou freight elevator parts, must mat put two pieces of wood. Before lifting, remove the hand wheel, washers and nuts.
 
2、以煤油洗去杭州貨梯防銹涂層,用手搖轉手輪使全部活動(dòng)部分達到全行程,同時(shí),將潤滑油涂在滑承面上。
Hangzhou Huoti kerosene wash antirust coating, with a hand wheel to resell part of all activities to reach full travel, while the lubricant is applied to the slide bearing surface.
 
3、重慶升降平臺地基的負荷力必須經(jīng)過(guò)試驗,在安裝前,水泥基礎應已經(jīng)干透并已結硬。在機床底下應盡量多插入鐵楔,機床在基礎上固定之前,必須用準確的水平儀來(lái)校準。水平儀首先校正縱向,隨后校正橫向。調整機床時(shí),工作臺應停放在正中位置,在調整完畢以后,用水泥漿聯(lián)同鐵楔灌滿(mǎn)機床底。必須待水泥漿結硬后,才允許旋緊基礎螺母,并且要隨時(shí)注意機床的水平度。
Hangzhou freight elevator load force foundation must be tested prior to installation, concrete foundation should be completely dry and has a hard knot. Hangzhou freight elevators under the machine should be inserted as much iron wedge,before the machine on the basis of fixed, must be accurately calibrated level meter. First level meter vertical correction, and then correct the lateral. Adjust the machine, the table should be parked in the middle position, after the adjustment is completed, the water filled with mud, together with the iron wedge bottom machine. After a hard knot grout must be allowed only tighten the nut base, and to pay attention to the level of the machine.

4、必須按照升降平臺潤滑表上所規定的時(shí)間進(jìn)行潤滑,在啟用機床之前,首先要熟悉各操作用的零件。在試車(chē)時(shí),把所有在滑軌上的固定裝置松開(kāi),用手搖轉各手輪作全程移動(dòng),然后接機動(dòng)部分。
Must be lubricated in accordance with the Hangzhou Huoti lubrication table specified time, before enabling the machine, the first to be familiar with the parts of each operation. When commissioning, all the fixtures on the slide release, with a hand full rotation turn each hand movement, and then the motor parts.
   


咨詢(xún)熱線(xiàn)

189-0831-8192